FROM (E) HH, MICROTRENCH AND INSTALL ±14101' 1.5" HDPE CONDUIT TO NEW HH'S/PEDS.INSTALL ±4996' OF 1-1" HDPE CONDUIT FROM MULTIPLE PED TO NEW FLOWER POTS IN VARIOUS LOCATIONS.INSTALL (24) NEW HH (17"X30"X24").INSTALL (28) NEW BDGNP12.INSTALL (42) NEW FLOWER POTS (9" X 12").TCP NEEDED FOR LANE SHIFT, ONE LANE FLAGGER, SHOULDER CLOSURE FOR NEW BDGNP12, NEW HH, NEW FP PL., TRENCHING, HAND DIG, SB & SAI ACCESS ON VARIOUS LOCATIONS.
1/7/2025 12:22:26 PM
Ryan Brady
TRAFFIC CONTROL 1ST SUBMITTAL
For all alley closures, contractor shall coordiante with solid waste disposal agency for access.
Pages 12-17 include Typical Application 31 (Figure 6H-31). This Typical Application does not appear to be correctly applied as the roadways where work is taking place are two lane roadways. Please utilize Figure 6H-105 (CA) (TA-105(CA)) as it is more applicable. If a low volume lane shift is contraindicated for any reason, install an alternative traffic control plan that maintains compliance with CA MUTCD.
Please install sidewalk closures as needed if the pedestrian path of travel will be impeded upon.
1/6/2025 8:55:20 AM
5/14/2025 8:56:37 AM
Excavation in newly renovated City streets is prohibited for three (3) years after filing of a notice of completion or acceptance of a new street or structural overlay of an entire street except as follows:
Emergency which endangers life or property;
Repair or modification to prevent denial or interruption of utility service;
Relocation work that is mandated by City, State or Federal legislation;
Service for buildings where no other reasonable means of providing service exists, as determined by the Director;
In a City street that the City has scheduled for resurfacing either during the fiscal year (July 1 - June 30) when the excavation permit is issued or during the immediately following fiscal year and the work takes place prior to the resurfacing;
For potholing to verify utility depth or location;
Horizontal Directional Drilling (HDD) excavations greater than eighteen (18) inches in depth of cover over the utility facility not requiring a significant surface incision greater than four (4) square feet and at a depth not greater than six (6) inches below the asphalt may be allowed at the discretion of the Director;
Other situations deemed by the Director to be in the best interest of the general public.