Notes:
8/14/2025 10:00:12 AM
TRENCH AND BORE TO PLACE ±1584' OF (1)-2" CPC FROM COUNTY ROW TO NEW HH/PEDS. TRENCH AND BORE PLACE ±615' OF (1)-1" CPC FROM NEW BDGNP12 /HH TO NEW FLOWER POTS IN VARIOUS LOCATIONS. INSTALL (3) NEW (17"X30"X24") HH, INSTALL (7) NEW FLOWER POTS (9"X12"). INSTALL (7) NEW BDGNP12. TCP NEEDED FOR ONE LANE FLAGGER & LANE SHIFT FOR POLE ACCESS, NEW FP, NEW HH PL., NEW BDGNP12, BORING, POTHOLING & TRENCHING ON VARIOUS ROADS.
11/6/2025 8:32:16 AM
Max Navarro
TRAFFIC CONTROL 1ST SUBMITTAL
Sheet 11, at least one lane open for vehicles to be flagged next work area. Phase potholes. Place type 3 barricades for sidewalk closures.
8/19/2025 3:48:35 PM