Notes:
7/15/2025 11:39:23 AM
Ryan Brady
TRAFFIC CONTROL 2ND SUBMITTAL
Page 2: Please place merging taper back from first revision. This is still needed as the turning traffic needs to merge with the through lane. Please remove the W4-5 sign and place typical merging lane closure signage. Also please close the #2 left turn lane for EB Pelandale traffic.
Page 3 & 4: Access to the church from NB traffic can stay open, the requested revision for delineation was for the delineation breaks between NB and SB traffic. The width and frequency of the gaps between opposing traffic is of concern. Please close these gaps. Provide a R3-2 sign aligned with the entrance of Fleur De Lis Dr (NB Dale) and provide an additional detour for NB traffic to access Fleur De Lis Dr.
Please place merging taper back from first revision. This is still needed as the turning traffic needs to merge with the through lane. Please remove the W4-5 sign and place typical merging lane closure signage. Also please close the #2 left turn lane for EB Pelandale traffic.
Ensure sufficient notice is provided to residents and HOA for the "Fleur De Ville" community as Fleur De Lis Drive is the only access to the neighborhood.
7/11/2025 8:23:05 AM
7/15/2025 11:40:39 AM
TIME & MATERIAL
7/15/2025 11:40:56 AM
TCP ONLY
Permit # BLD2023-02339