Notes:
9/14/2023 11:17:53 AM
Replace feeder between MID Transformer and MID Meter Section. MID is requesting that the City inspect the terminations on the Utility point of connection at the main switchboard. After call with City Building Deparmtnet it was recommended to file for a permit without drawings to obtain inspection. We are using existing the conduit and replacing feeders per MID requirements..